11/20 2015

I-376 East Complete Closures THIS Weekend Fri 11/20 11pm through Sun 11/23


Warning: Undefined variable $output in /home2/oakcliff/public_html/wp-content/themes/mw-small-Oakcliffe/functions.php on line 103
From the Mayors Office:
 

PITTSBURGH, PA (Nov. 19, 2015) – The City of Pittsburgh Department of Public Works, in conjunction with PennDOT and Mosites Heavy Construction, remind residents that the following I-376 East (Parkway East) closures of both the inbound and outbound lanes will be in effect this weekend:

Friday, Nov. 20 – Sunday, Nov. 23

Closed: Friday, Nov. 20 at 11:00 p.m.  

Reopen: Monday, Nov. 23 at 6:00 a.m.

The eastbound (outbound) closures will begin at Oakland (Exit 72A). All outbound traffic will be directed to the posted detour starting at Exit 72A. Additionally, the Bates St. outbound entrance ramp will be closed. A map of the eastbound closures and detours can be found here.

The westbound (inbound) detour will begin at Wilkinsburg Exit 78B. Inbound traffic coming from the east will be directed to the posted detour starting at Exit 78B. Local traffic traveling westbound will be able to use the Edgewood/Swissvale Exit 77 off-ramp. The Edgewood/Swissvale and Sq. Hill/Homestead on-ramps to I-376 inbound will be closed. Motorists traveling westbound out of Oakland on the Boulevard of the Allies will be able to access I-376 westbound at the Boulevard of the Allies entrance ramp. Motorists in Downtown Pittsburgh will be able to access I-376 westbound at Grant Street (71A). A map of the westbound detours and closures can be found here.

Police officers will be on site at critical intersections on the posted detour routes to assist with traffic flow and ensure safety for all roadway users. Motorists should expect significant delays on posted detour routes.

The closures will be administered by Mosites, the contractor that is overseeing the Greenfield Bridge reconstruction project. The closures are necessary to allow Mosites to perform deconstruction work on the Greenfield Bridge. Crews will be removing the concrete slabs that make up the road surface of the bridge that passes over the closed portions of I-376. This work must be done in advance of preparing the bridge for implosion. Full details on the Greenfield Bridge closure and Reconstruction Project can be found here.

The City of Pittsburgh has made every attempt to minimize the impact of this closure on planned city events. The magnitude and tight schedule for the Greenfield Bridge reconstruction project require these additional weekend closures.  

The city and its partners have a seven week window in which two weekend closures are permitted to take place, not counting the Christmas to New Year’s closure in December 2015. These proposed weekend closures reflect the dates most suitable for closure needs and for minimizing impacts to public events in Downtown, the North Shore and elsewhere.

Possible Alternate Routes

To avoid lengthy delays on the posted detour, PennDOT also suggests taking the Pennsylvania Turnpike in Monroeville to the Harmar Interchange (Exit 48) and using southbound Route 28 to access downtown.

Motorists may also consider taking the Pennsylvania Turnpike in Monroeville to the I-79 interchange in Cranberry (Exit 77) and following I-79 south to the Parkway North (I-279) to Pittsburgh.

Maps and descriptions of alternate routes can be found here.

 

11/16 2015

PHEAA Financial Aid Workshop – 475 E Waterfront Dr, Homestead Tue 11/24 6:30pm-8pm


Warning: Undefined variable $output in /home2/oakcliff/public_html/wp-content/themes/mw-small-Oakcliffe/functions.php on line 103
Financial Aid Workshop
Sponsored by PA State Senator Jay Costa
Get answers about federal, state and institutional aid.
​Tuesday, 11/24 6:30pm-8pm
Allegheny Intermediate Unit, McGuffey/Sullivan Room
475 E  Waterfront Dr, Homestead, PA 15120
  • Learn about the financial aid process.
  • Receive a timeline checklist to stay on track

For information call (412) 241-6690

11/12 2015

Yard Debris Special Collection – Fall 2015 – Sat 11/14


Warning: Undefined variable $output in /home2/oakcliff/public_html/wp-content/themes/mw-small-Oakcliffe/functions.php on line 103
The City of Pittsburgh’s Department of Public Works Bureau of Environmental Services will be collecting leaf and yard debris from all residents in a special curbside collection on Saturday, November 14.
 
Residents should place yard debris at normal collection sites before 6:00 a.m. on Saturday, November 14. All yard debris materials will be collected by city refuse and recycling crews and composted on Saturday November 14.
 
Bag Leaves for Collection: Residents must bag leaves in paper bags only and place them out at normal refuse collection sites. Bags should NOT exceed 35 pounds. Leaves in plastic bags will NOT be accepted. Paper yard debris bags can be purchased at local hardware or department stores.
 
Tree Branches and Bushes: Cut, bundle and tie branches and bushes in lengths not exceeding 5 ft. in length. Tree branch diameter should not exceed four (4”) inches.
 
Please Note: Yard debris NOT meeting the collection guidelines will be left at the curb. Yard waste should not contain dirt, rocks, stones, cement, metal, wire, glass or plastic.
 
If you have any questions, please contact the Bureau of Environmental Services at (412) 255-2773 or (412) 255-2631.
11/10 2015

Presentation On The Mill Development At Oakcliffe Mtg Wed 11/11 7pm – Pt 3 of 3


Warning: Undefined variable $output in /home2/oakcliff/public_html/wp-content/themes/mw-small-Oakcliffe/functions.php on line 103
Walnut Capital is on the agenda for the Oakcliffe Community Group of South Oakland’s monthly meeting, this Wednesday 11/11 at 7:00 pm. The meeting is at Community Human Services (CHS) 370 Lawn St, Pittsburgh, PA 15213.
 
Please attend the meeting to hear about Walnut Capital's plans for the site as well as proposed improvements/changes to the adjacent section of the Eliza Furnace Trail.
11/10 2015

Presentation On The Mill Development At Oakcliffe Mtg Wed 11/11 7pm – Pt 2 of 3


Warning: Undefined variable $output in /home2/oakcliff/public_html/wp-content/themes/mw-small-Oakcliffe/functions.php on line 103

pdf icon Planning-Commission-Briefing-Walnut-Capital-The-Mill-on-Second-Ave_Part2.pdf

Walnut Capital is on the agenda for the Oakcliffe Community Group of South Oakland’s monthly meeting, this Wednesday 11/11 at 7:00 pm. The meeting is at Community Human Services (CHS) 370 Lawn St, Pittsburgh, PA 15213.
 
Please attend the meeting to hear about Walnut Capital's plans for the site as well as proposed improvements/changes to the adjacent section of the Eliza Furnace Trail.
11/10 2015

Presentation On The Mill Development At Oakcliffe Mtg Wed 11/11 7pm – Pt 1 of 3


Warning: Undefined variable $output in /home2/oakcliff/public_html/wp-content/themes/mw-small-Oakcliffe/functions.php on line 103

pdf icon Planning-Commission-Briefing-Walnut-Capital-The-Mill-on-Second-Ave_Part1.pdf

Walnut Capital is on the agenda for the Oakcliffe Community Group of South Oakland’s monthly meeting, this Wednesday 11/11 at 7:00 pm. The meeting is at Community Human Services (CHS) 370 Lawn St, Pittsburgh, PA 15213.
 
Please attend the meeting to hear about Walnut Capital's plans for the site as well as proposed improvements/changes to the adjacent section of the Eliza Furnace Trail.
11/04 2015

Joncaire Steps Info At Next Green Team Mtg – Thu 11/19 6pm At Career Ctr


Warning: Undefined variable $output in /home2/oakcliff/public_html/wp-content/themes/mw-small-Oakcliffe/functions.php on line 103

pdf icon GreenTeamFlyer-Nov-19-meeting-Joncaire.pdf

Inline image 1
​​Next Green Team meeting: Thursday, November 19 at 6 pm 
Oakland Career Center, 294 Semple Street 
  • Review final design for Joncaire Steps 
  • Action steps for safer Oakland streets reconstruction project
​See the attached flyer for more contact and meeting info​

11/03 2015

West Carson St Ramp from S 51 to S 837 Closure Begins Tue 11/3 Through Thu 12/3


Warning: Undefined variable $output in /home2/oakcliff/public_html/wp-content/themes/mw-small-Oakcliffe/functions.php on line 103
  West Carson Street Ramp from Southbound Route 51 to Southbound Route 837 Closure begins Tue 11/3
PennDOT is announcing a closure of the West Carson Street ramp that carries traffic from southbound Route 51 to southbound Route 837 in the City of Pittsburgh, Allegheny County, will begin Tuesday, November 3 weather permitting.
Crews from the Lane Construction Corporation will begin full depth excavation and reconstruction of the ramp that carries traffic from southbound Route 51 to southbound Route 837 on West Carson Street on Tuesday at 9 a.m.  The ramp will remain closed through Thursday, December 3.  Traffic will be detoured.
Posted detour:
• Traveling southbound on Route 51 (West Carson Street), motorists will continue past the closed ramp toward the West End Circle
• Turn right onto Steuben Street
• Turn left onto Short Street toward Crafton/Downtown – North 19/60 
• Turn left onto South Main Street toward West End Bridge/Downtown – North 279/19
• Turn right onto southbound Route 837 (West Carson Street) toward Downtown
• End detour
 

11/03 2015

Grassroots Green Homes Program Recruiting Participants in Oakland


Warning: Undefined variable $output in /home2/oakcliff/public_html/wp-content/themes/mw-small-Oakcliffe/functions.php on line 103

pdf icon GGH-Flyer-10.7.15.pdf

Inline image 1
Announcing an energy and cost saving program – called Grassroots Green Homes – that Conservation Consultants, Inc. are trying to get off the ground in the neighborhoods of Uptown and Oakland.  This program will provide free energy saving tools and tips to participants – to help residents save money on their electricity and heating bills and reduce their environmental impact.

​They​

 are currently trying to get the word out about this program and generate interest in order to recruit community liaisons (Energy Coaches).  These Energy Coaches will help sign up participants for the program and be their point of contact throughout the year-long program.  

​They​

aim to have ten Energy Coaches who will receive training, support materials, and a small stipend to help enable and encourage energy savings for the 500 participants in the Grassroots Green Homes program.  More information is in the attached flyer.

​For more information about CCI check out their website at